2026-11-17
As road infrastructure shifts from expansion to maintenance, urban road projects increasingly involve multiple jobs running simultaneously, smaller batches, more mix designs, and urgent material demands. The industry faces a growing challenge: meeting diverse project needs, increasing RAP usage, and balancing production efficiency, profitability, and environmental performance.

To address these challenges, NFLG will unveil the LBNZ Integrated Counter-Flow Asphalt Mixing Plant with Dual RAP Systems at bauma CHINA 2026, November 24–27. Its three-in-one design integrates modular systems for foamed asphalt, cold RAP addition, and colored asphalt production, allowing operators to switch production modes as needed. Designed for flexible, high-volume production, the plant handles multiple mix designs and high RAP percentages with ease.
Highlights
Flexible output: It delivers a capacity of 240–800 t/h and supports virgin aggregate, high-RAP, and 100% RAP production modes, ensuring consistent production across multiple mix designs.
Ample storage: It provides a 4,000 t finished mix storage silo, expandable to meet customer requirements, with real-time temperature and weight monitoring.
High RAP content: It supports stable production with 50–100% RAP through a jacketed, multi-stage hot-air furnace paired with a counter-flow drum. Gentle heating minimizes the risk of overheating and oxidation.
Dual mixers: It features two 6.5 t mixers for high-volume batches.

During the exhibition,
NFLG will conduct daily
foamed asphalt testing
Supporting warm-mix production and RAP recycling
with valuable test data,
while reducing on-site testing and commissioning costs.
We look forward to meeting you
and exploring new possibilities in asphalt mix solution!
Meet NFLG at bauma CHINA 2026
November 24–27 | Booth B40/C40
We welcome your on-site discussion.
400-887-7788
Email:[email protected]
+8659522905555
© 2025 NFLG Inc. All rights reserved.